T7 Release 13.0: Important information for production start

Release date: 28 Oct 2024

048/2024 T7 Release 13.0: Important information for production start Xetra Circular 048/24

1.   Introduction

Deutsche Börse Group will launch Release 13.0 of the T7 trading system on 18 November 2024.

The support window for T7 Release 13.0 will take place on Saturday, 16 November 2024, between 15:00 and 18:00 CET.  Connectivity testing during the support window is strongly recommended for all participants and Multi-Member Service Providers.

The circular outlines the most important topics for the go-live preparation that should be considered for the production launch of T7 Release 13.0 as well as details about the support window.

Please note: The usage of the enhanced short message layouts, which were introduced in the T7 Release 13.0 Simulation environment on 1 October 2024, will be mandatory for all Participants in the production environment from the T7 Release 13.0 production launch. Please refer to Xetra Circular 036/24 for more information.

2.   Action required

Participants are requested:

  • to complete and return the production readiness statement (see section 3.F.) and
  • to register a Technical Contact for the support window (see section 3.E.)

not later than Friday, 8 November 2024.

3.   Details

Deutsche Börse Group will launch Release 13.0 of the T7 trading system on 18 November 2024. Please refer to the dedicated document “T7 Release 13.0 Final Release Notes” for a full overview of both the new and changed functional scope.

The document is available on the Xetra website www.xetra.com via the path:

A.  Backwards compatibility

T7 Release 13.0 will not provide backwards compatibility for the T7 ETI/FIX LF interface version 12.1, i.e. participants will have to use the new interface version and will not be able to connect to T7 with the interface layout version of T7 12.1 or a previous version anymore, after the production launch of T7 Release 13.0.

Public market and reference data interfaces, including EOBI, EMDI, MDI, RDI/RDF, as well as reports and data files, will not provide backwards compatibility.

B.  Preparations for Friday, 15 November and Saturday, 16 November 2024

On Friday, 15 November 2024, T7 Release 12.1 will be in production for the last time. Reports for the business day 15 November 2024 can be expected at the usual time.

On Saturday, 16 November 2024, Deutsche Börse will convert the Cash Markets T7 production systems to Release 13.0 and initial reference data for business day 18 November 2024 will be available via RDI and RDF following the start of the system in preparation for the support window.

C.  Support window for T7 Release 13.0 on Saturday, 16 November 2024

The T7 Release 13.0 support window will be conducted on Saturday, 16 November 2024, between 15:00 and 18:00 CET. Connectivity testing during the support window is strongly recommended for all participants and Multi-Member Service Providers to ensure connectivity for the start of trading on Monday, 18 November 2024. Please make sure that a staff member will be available to perform the login to the T7 production system (e.g., T7 Trader- and/or Admin GUI and third-party applications).

At this time, the T7 production systems will be available for connectivity testing on the ETI, RDI, FIX LF, MDI, EMDI and EOBI interfaces and via T7 Admin-, T7 Clearer- and T7 Trader GUI. No order and quote entries will be possible.​

Please note that during the support window, at approximately 15:30 CET, all products in the T7 production systems will be set to "Start of Day" providing participants the opportunity to perform their regular start of day activities:

Market data:

After the start of day, product and instrument state change information messages are sent out. Thereafter snapshots are sent out periodically (MDI, EMDI, EOBI) in addition to functional beacons or heartbeats via the incremental stream in EMDI and EOBI, respectively. Traders do not have access to the orderbook.

Please refer to the document “T7 Release 13.0 Market and Reference Data Interfaces Manual” (Section 9.12.0) for further details.

ETI and FIX LF:

–  In general, session and user logons are possible.
  ETI: It is possible to send retransmission requests.
–  FIX LF: It is possible to send resend requests.
–  Orderbook management is not possible.
–  Order book restatement messages will be sent during start of day switch. Please refer to the documents “T7 Release 13.0 Enhanced Trading Interface Manual” (Section 4.7.11) and “T7 Release 13.0 FIX LF Manual” (Section 3.8.11) for further details.

During the support window a message “Connection Test Xetra <hh:mm:ss>” or “Connection Test Börse Frankfurt <hh:mm:ss>”, respectively, appears with an increasing sequence number in the market news view (news board) of the T7 Trader GUI and the T7 Admin GUI. 

Deutsche Börse will inform participants about the general progress of the support window via implementation news on the Xetra website available via the path:

Following the end of the support window, the T7 13.0 production system will be shut down on 16 November 2024 at 18:00 CET and will be unavailable until Sunday evening. 

MsgSeqNum’s in FIX LF
Please note that after the connection test, MsgSeqNum’s (inbound and outbound) will not be reset upon the next start of day/start of the FIX Gateway.

This point is documented in the T7 Release 13.0 FIX LF Manual in the section “5.10.2 Outage on T7 FIX LF Side”.

D.  Monday, 18 November 2024 – Production start

The first trading day with T7 Release 13.0 will start as usual.

Please note: As the system will be re-started Sunday evening after the connection test on Saturday, the initial reference data file for the business day 18 November 2024 will be re-generated. As the reference data provided on 16 November 2024 via RDI and RDF prior to the support window may potentially contain some changes, participants are required to use the initial reference data provided following the system start for 18 November 2024.

Orders entered until 15 November 2024 (end of trading) but not executed, will continue to be available on 18 November 2024, unless other validity restrictions were set.

A list of any items that are relevant prior to the production start of T7 Release 13.0 will be provided as of 15 November 2024. This “known limitations” list will be available on the Xetra website under the path:

E.  Technical Contact for the support window

Please enter details of the contact person who will be available during the support window in the Member Section of Deutsche Börse Group not later than Friday, 8 November 2024, under the path:

Member Section > Company Contacts > [+] Create Contact > Contact Types > Release

Please choose the category “Connection Test Responsible” and make sure to check the box “Cash Market T7”.

This will ensure that Deutsche Börse will be able to reach you in any emergency between Saturday, 16 November 2024, and production start on Monday, 18 November 2024.

F.  Provision of the Readiness Statement

We kindly ask all Trading Participants to submit the Readiness Statement for T7 Release 13.0 by Friday, 8 November 2024 latest.Please note that all Trading Participants are required to provide the Readiness Statement. 

The online Readiness Statement for T7 Release 13.0 can be found here: Readiness Statement

Please enter your dedicated Cash PIN in the online questionnaire. The PIN is now available via the Member Section, accessible to Central Coordinators and their Deputies only, under the following path:

Member Section > My Profile > PIN


Further information

Recipients:

All Xetra® Trading Participants and Vendors

Target groups:

Traders, Technical Contacts, Security Administrators, System Administrators, Nominated Persons, General

Contact:

Technical Key Account Manager via your VIP number or cts@deutsche-boerse.com

Web:

 Technology > T7 trading architecture > System documentation > Release 13.0

Authorised by:

Holger Patt, Oliver Grohmann